Select Recent Projects - More Details

Legacy Health Hospitals - Good Sam GS-2 Whole Building, Mt Hood GS Whole Building, Holladay Park Chiller Upgrade and Davis Whole Building Energy Usage Improvement Evaluations via ICF/Energy Trust of Oregon

Pacific Natural Foods - develop alternative ventilation approaches for product cooking areas, perform engineering and economic feasibility evaluations.

Kaiser Honolulu, Energy Performance contract solicitation and review processes work. The lead contact, Tony Moiso provided the quote included on the home page of this website on what he “knew he would get when working with KFAA”.

Daikin/McQuay Applied Americas, performed AHU sizing, ductwork design, load calculations and energy usage analysis for a retrofit application at a very large retirement home complex’s main building, Capital Manor in Salem, OR.

Norris Beggs and Simpson/Felton Property Management in Portland, assisted with LEED processes (Energy Star and Energy Audits/Analysis) on Two downtown high-rises in Portland, OR.

  - Plus Engineering DDC Upgrades at four buildings to develop engineering, bidding and procurement documents.

 Sazan Group out of Seattle, provided sustainability implementation/tracking support for King County Waste Water Treatment Plant Upgrade projects.

 ICF/Energy Trust of Oregon (ETO) – Energy Modeling/auditing work, for a “targeted” DDC upgrade focused energy audit for the Rose City United Methodist Church in Portland, Oregon for ICF/ETO using Equest. Tim Clark ICF Lead Engineer reviewing the analysis report indicated that this effort for them produced a “high quality report and results”.

Advanced Technology Group and Corbin Engineering provided controls design support for their project’s HVAC systems for a new “Quantum Clean” Clean Room Facility in Hillsboro, OR.  

Fortis Construction, provided technical design/troubleshooting assistance with on the HVAC controls for the systems for Hitachi’s new clean room facility in Hillsboro, OR.

 Johnson Controls, Inc contracted with me to perform  energy auditing and modeling for the Beaverton School District’s  Cedar Park Middle School. The project involved data logging for CO2 levels in classrooms as well as larger meeting spaces, and temperatures in classrooms and well as many larger spaces. Infrared imaging analysis as well as an indoor lighting survey, and exterior photo-metrics were performed. Several site visits were made to complete the above surveys, collect data to fill in gaps from the substantial amount of missing information from the facility design documents (old and hard to read), and observe school usage/system operation patterns. Energy+ was the model used for energy simulation and modeling evaluations for certain “dynamic” measures, hand calculations were used for other more “linear” measures. Select amount of BIN analysis was used to verify and adjust some outputs based on observations in the field, which did not seem to match up with the output results from the model.

Corbin Engineering performed controls design assistance work at the Boeing Facility in Gresham OR. 

IKOI Terrace – provided technical assistance and infrared imaging services on an energy analysis of this low income housing project located in Milwaukie, OR.

Throughout 2014  I performed an energy audit/analysis work along with Energy Star Portfolio Manager interface for EcoREAL Architects to support their efforts to obtain LEED Certification for Fulton Properties, 400 SW 6th Office Building downtown Portland and the Cascade Office Building also downtown Portland.

o   In addition I performed an energy audit/analysis work the Portland Development Commission (PDC) and EcoREAL Architects (using Equest) under the PDC’s Urban Renewal assistance program. This work was on a new  retailer in their program, Hand and Eye Supply. The effort was to help the new owners understand their alternative HVAC option cost/benefit implications for their new space.

 

·